Hoş Geldiniz
Hizmetlerimiz
Epoxy Flooring
High mechanical strength and chemical resistant flooring applications.
İncele
Polyurethane Systems
Flexible coatings ideal for sports halls and industrial areas.
İncele
Industrial Concrete
Long-lasting, wear-resistant concrete floors for factories and warehouses.
İncele
Projelerimiz
SSS
Depending on the ambient temperature, complete drying of epoxy floor coatings can take between 24 and 48 hours. It is recommended to wait 7 days before opening it to heavy load traffic.
Yes, since polyurethane coatings have UV resistance, they can be safely used outdoors, especially in parking lots and sports fields.
The floor is roughened with milling, wiping, or sandblasting machines, and freed from dust and oil. If necessary, crack repairs are made, and the primer coat application begins.